Pictures from the construction site!

The foundation for the fence is being made.
All the cement blocks are made on site. Heavy work at 35 degrees!
The front is being fitted with a door, gate and fencing.
The borehole with solar is installed by Fandema. Female students watch and help.
The gate consists of metal and wood and is made here on site.
The pillars for the gate are being grouted.